DESCRIPTION:
Preparing a design of the I&C system and cabinet prefabrication, developing software and visualisation, delivering automation devices and prefabricating cabinets for the engine test stand.
This project involved the following:
- preparing a design of the I&C system, prefabricating and delivering a PLC cabinet and field devices,
- software for the Siemens S7-300 PLC, visualisation for the MP 377 19” HMI and communication with the master system,
- installing the exhaust extraction ventilation system,
- installing the cooling and chilled water system,
- preparing as-built documentation